![]() Before. |
![]() Before. |
![]() Layers of flooring. |
![]() Yuck. (Actually, it's not as bad as it looks.) |
![]() Tearing up plywood base. |
![]() Sub-floor exposed. You can see how rotten it is around the toilet. |
![]() Rotton sub-floor surgically removed. |
![]() Braces in place to support sub-floor patches. |
![]() Beginning to install patches. |
![]() The new plumbing. (I forgot to take a pic of the old, steel plumbing.) |
![]() Rotten sub-floor all patched up. |
![]() First piece of concrete board in place. |
![]() Seconds piece and closet flange in place. |
![]() Third and final piece in place. |
![]() Spacing the tiles before setting them permanantly. |
![]() First few tiles laid. |
![]() Done laying the tile. |
![]() Grout's in. |
![]() Grout's in and haze washed away. |
![]() New Bathroom. |
![]() Another view. |
![]() More-or-less done. Still need to paint the walls a new color, install baseboards and window trim, and put up a new medicine cabinet that doesn't look so much like it came from a dorm room. |