Before.

Before.

Layers of flooring.

Yuck. (Actually, it's not as bad as it looks.)

Tearing up plywood base.

Sub-floor exposed. You can see how
rotten it is around the toilet.

Rotton sub-floor surgically removed.

Braces in place to support sub-floor patches.

Beginning to install patches.

The new plumbing.
(I forgot to take a pic of the old, steel plumbing.)

Rotten sub-floor all patched up.

First piece of concrete board in place.

Seconds piece and closet flange in place.

Third and final piece in place.

Spacing the tiles before setting them permanantly.

First few tiles laid.

Done laying the tile.

Grout's in.

Grout's in and haze washed away.

New Bathroom.

Another view.

More-or-less done. Still need to paint
the walls a new color, install baseboards and
window trim, and put up a new medicine cabinet
that doesn't look so much like it came from
a dorm room.
   